Project |
Fabricate a 300NB above ground bypass to the Maui Pipeline (~1km long). Tie into the Maui Pipeline to create a temporary bypass and carry out repairs at designated locations.
Energyworks Limited has grown within the Energy sector in Taranaki to become a leading specialised multidisciplined engineering company throughout New Zealand.